Metis N4 Construction is working with Manitoba Hydro on the Manitoba-Minnesota Transmission Project (MMTP)

The project includes construction of a 500-kilovolt AC transmission line in southeastern Manitoba along with upgrades to the associated stations at Dorsey, Riel and Glenboro. The proposed route will begin at the Dorsey Converter Station, travel south around Winnipeg passing the Riel station (along the Southern Loop corridor), continue south to the Manitoba-Minnesota border and connect to the Great Northern Transmission Line (constructed by Minnesota Power). Subject to regulatory approvals the anticipated service date is in 2020.